Engineering Capability
For checking fixture: 54 engineers in total, 20% are senior engineers, 50% are second class engineers. 45% engineers have 5 years work experience in this area.
For welding automation: 64 engineers in total, 20% are production engineers, 12% are electrical engineers, 68% are design engineers. 51% engineers
have more than 5 years work experience in this area.
Design Simulation
According to static simulation based to ensure the design is feasible.
According to dynamic simulation based on ensure the welding is feasible.
Customer Standard
Translate and Refine the standard,ensure gauge designing and building meet customers` requirements.